What happens if I choose not to obtain the required permits?

Building & Zoning Code Compliance will issue a notice of violation. Once a permit is obtained, the cost will could be 3x to 5x the building permit fee for an After the Fact permit. Additionally, there may be additional  fees from a third party engineer evaluation if areas of work are obscured.

Show All Answers

1. When is a permit required?
2. Do I need a contractor?
3. What happens if I choose not to obtain the required permits?
4. How long is my permit good for?
5. How does a contractor get registered with the Town of Fort Myers Beach?
6. How do I extend my permit that is issued but about to expire?
7. If my permit has "failed" an inspection, is there an extra fee charged?
8. What is the current review period for building permits?
9. What do I need if I live in a condo and want to replace my windows?
10. Do I need a permit to Erect/ Replace a fence?
11. Do I need a permit for a deck?
12. How close can a pool enclosure/pool be to a seawall?
13. How close can you get to a non-seawalled natural body of water (Rip Rap)?
14. What is needed for minor Condo Renovations?
15. Do I need a permit for a Chickee hut?