News Flash Home
The original item was published from 9/18/2020 5:48:04 PM to 11/21/2020 12:00:04 AM.

News Flash

Advisories

Posted on: September 18, 2020

[ARCHIVED] Big Carlos Pass Bridge maintenance to start September 28

big carlos pass

Big Carlos Pass Bridge maintenance to start September 28


 A contractor for the Lee County Department of Transportation will be performing maintenance work on the Big Carlos Pass Bridge. Activities are scheduled to start on September 28, 2020, and should be completed by November 20, 2020. Motorists should use caution, as there will be sporadic lane closures.

The contractor will be performing concrete repairs on the bridge deck. The job consists of removing the protective epoxy surface course and then removing and replacing the spalled / unsound concrete below it. Once the concrete has been removed and replaced, the contractor will replace the epoxy coating surface course. The repair locations will be removed and replaced daily. No open spots will be left overnight.

This project is not the entire bridge. It will only be spot repairs where needed. Lee County anticipates that the project will start on the Bonita / Southside of the bridge and move toward the FMB side.

Facebook Twitter Email